Little area. Clear income. No effort.
Modern battery storage stabilizes the power grid. They just provide a suitable area. We take care of everything else completely – including documentation and operation.
Long-term contract
Plannable term and clear conditions.
No investment costs
Planning, construction and technology are our responsibility.
No operating costs
We take care of monitoring, maintenance and operation.
Sensible use of space
Unused land areas become economically usable.
What makes an area suitable?
We check transparently and quickly. Typical criteria include: Access, floor space and proximity to the grid connection (e.g. transformer/transfer point).
-
footprint
A small, flat area of land (e.g. around 4 m²) may be sufficient - depending on the project.
-
Access & Operations
access for construction and maintenance; minor impairment in normal operation.
-
Netzanbindung
The decisive factors are the proximity to the grid connection point/transformer and the technical feasibility.
-
Sicherheit
Sound insulation and safety concepts are planned and implemented on a project-specific basis.
Process in 3 steps
This means we can quickly come to a clear decision – transparently and without any effort for you.
1) Kurzcheck
Key data on area, location and access – non-binding.
2) Examination & Offer
Technical testing (including network) and clear contract options.
3) Implementation and operation
Planning, construction and operation by us – you receive the agreed lease.
FAQ
Short answers to frequently asked questions.
Do I have to invest or take care of operations?
No. We take care of planning, construction, operation and maintenance – you just provide the space.
How does the exam work?
We start with a quick check and then check technical criteria such as network connection and access.
What happens to my area during operation?
The area is used for the system. Maintenance access is regulated and the effort required for you in everyday life is minimal.
Can I read the lease details?
Yes – you can find the process on this page under Process. The page for investors is Storage Investment.